Dear All,
Is there a given set up in case of a model configuration having a recycle with multiple (5) sub-flowsheets ?
The matter is that I am facing quite low solving time, each time when I run the simulation model either if I change mass composition at inlet streams or a temperature in a heat exchanger.
Thanks and a prosperous 2015 for all members !!
Marcelo