Page 1 of 1

Reactors

PostPosted: 03 September 2019, 01:54
by aken
Does a voidage of 1 mean the reactor is empty ie no catalyst loaded. And can l determine the voidage volume by multiplying reactor volume by voidage. Thanks

Re: Reactors

PostPosted: 10 September 2019, 20:09
by jasper
Sorry for the delay. Yes, and yes. 1 means an empty reactor and the reactive volume is total volume times voidage.